Beginning of the excavation for the Beam in Millsboro De
In this photo Luis is shown begging the excavation of the hole for the beam. When they dig they also need to make sure it is deep enough so they can get far enough in to install the Smart Jacks.
Hole for the Smart Jack being dug in Millsboro De
In this photo Luis can be seen digging a hole so that the Smart Jack may be installed. This is done to allow for the Smart jack to reach harder soil underneath the top layers.
Beam insertion in Millsboro DE
This photo shows Luis inserting the Girder underneath the house. The smart jacks will later be attached to the Beam in multiple location under the house in order to fix the foundation and provide further support.
Installed Smart Jack in Millsboro De
This is a photo of the Smart Jack which shows it buried underground and connected to the Beam.
Ground being smoothed in Millsboro DE
We at DryZone aim to make the site look better then when we arrived there. One of the ways we do this is when we dig up soil we make sure to put it back and make it level.