The hammer drill is a tool that our crews use to get a nice clean edge on the concrete base. The helical piers, and more importantly the bracket that holds them in place, needs to be flush to the wall. If we tried to install the piers on an extended piece of concrete, the pressures created by trying to lift up would snap off the concrete. This is not only ineffective, but incredibly dangerous too.